Procurement


 

 

Open Bids 

 

Number Name Due Date/Time Description Bid Tabulation
P2018- 03 Sodium Bisulfite 38% 05/08/18 at 3:30PM The material to be furnished per DELCORA Specification is Sodium Bisulfite and shall be a 38% solution which is intended for use as a dechlorinating agent from 07/01/18 – 06/30/19. Download PDF

 

 

Closed Bids

Number Name Due Date/Time Description Bid Tabulation
P2017-01 Primary Clarifier Parts 03/13/17 at 3:30 PM Supply and delivery of chain, sprockets and flights to DELCORA’s Wester Regional Treatment Plan as specified in the pdf. Download PDF
P2017-02 Lawn Mowing and Maintenance 03/13/17 at 3:30PM Complete lawn cutting and maintenance services for several DELCORA facilities, detailed in the pdf, from 04/01/17-10/31/17. Option to extend for 2 consecutive years. Download PDF
P2017-03 Liquid Polymer Flocculant 05/08/17 at 3:30 PM Liquid Polymer, per DELCORA’s specifications, to dewater 1700 dry tons of solids per month, for DELCORA’s Western Regional Treatment Plant’s belt filter press operation from 06/01/17-05/31/19. Download PDF
P2017-04 Liquid Polymer for Sludge Thickening Process 05/08/17 at 3:30PM Liquid Polymer, per DELCORA’s specifications, to dewater 550 dry tons of solids per month, for DELCORA’s Western Regional Treatment Plant’s belt filter press operation from 06/01/17-05/31/19. Download PDF
P2017-05 Removal and Transportation of Dry Ash 05/08/17 at 3:30PM Furnish all equipment and labor per DELCORA specifications for the removal of Dry Ash from municipal sewage sludge incineration at the Delaware County Regional Water Quality Control Authority, Western Regional Treatment Plant (WRTP) from 06/01/17 – 05/31/19. Download PDF
P2017-06 Sodium Bisulfite (38%) 05/08/17 at 3:30PM The material to be furnished per DELCORA Specification is Sodium Bisulfite and shall be a 38% solution which is intended for use as a dechlorinating agent from 07/01/17 – 06/30/18. Download PDF
P2017-07 Replacement Belts for a Belt Filter Press 06/12/17 at 3:30PM The vendor shall supply and deliver the designated number of upper and lower Durotex, or equal, replacement belts used for a sludge dewatering application for a belt filter press to DELCORA’s Western Regional Treatment Plant from 7/1/17 – 06/30/18. Download PDF
P2017-08 Phosphoric Acid (85%) 08/07/17 at 3:30PM The material to be furnished under this Specification is Phosphoric Acid and shall be an 85% solution. The Phosphoric Acid shall be a colorless, transparent, syrupy liquid intended for use in waste water treatment from 10/01/17 – 09/30/18. Download PDF
P2017-09 Ultra-Low Sulfur Fuel Oil (#2 Heating Oil) 06/07/17 at 3:30PM For the furnishing and delivery of Ultra-Low Sulfur Fuel Oil (#2 Heating Oil) per DELCORA Specifications to DELCORA’s Western Regional Treatment Plant from 10/1/17 – 09/30/18. Download PDF
P2017-10 Janitorial Services 09/12/17 at 3:30PM Furnish all labor, material and equipment necessary to perform Janitorial Services in and around the Administration Building located at 100 E. 5th Street, Chester, PA in accordance with DELCORA specifications from 10/1/17 – 09/30/18. Download PDF 
P2017-11 Residential Delinquent Notice Posting Service 09/12/17 at 3:30PM To provide all labor, materials, services, skills supervision and necessary equipment needed to deliver residential delinquent notice posting services within the Authority services territory per DELCORA Specifications from 10/01/17 – 09/30/18. Download PDF
P2017-12 Primary Clarifier Spare Parts 09/12/17 at 3:30PM The vendor shall supply and deliver the designated amount of chain, sprockets and flights to DELCORA’s Western Regional Treatment Plant per DELCORA specifications from 10/1/17 – 09/30/18. Download PDF
P2017-14 Dewatered Solids Transportations, Stabilization and Beneficial Use/Disposal Services 09/12/17 at 3:30PM To furnish all labor, equipment, tools, supplies, materials, facilities and permits necessary and required per DELCORA specifications to transport dewatered solids from the DELCORA WRTP to Contractor’s suitable and permitted facility for the purpose of receiving, stabilizing, storing (when required), and beneficial use of solids generated at the DELCORA WRTP from 10/1/17 – 09/30/19. Download PDF
P2017-15 Liquid Chlorine in One-Ton Cylinders 12/12/17 at 3:30PM To furnish and deliver Liquid Chlorine in One Ton Cylinders per DELCORA specifications and in strict accordance with the contract documents to DELCORA WRTP from 01/01/18 – 12/31/18. Download PDF
P2017-16 Liquid Caustic Soda 02/13/18 at 3:30PM For the furnishing and delivery of Liquid Caustic Soda, 50% Solution and 20% Solution per DELCORA Specifications to DELCORA’s Western Regional Treatment Plant from 03/1/18 – 12/31/18. Download PDF
P2017-17 Unleaded Gasoline and Diesel Fuel with Tracking System 11/14/17 at 3:30PM For Dispensing of Unleaded Gasoline and Diesel Fuel with tracking system per DELCORA specifications. To furnish the estimated requirements listed in strict accordance with the contract documents and at the unit prices shown for a period beginning on 12/1/17 – 11/30/18. Download PDF